Resurfacing works on A66 near Keswick to run for five weeks

  • Published
A66 at ThrelkeldImage source, Google
Image caption,

The A66 will be resurfaced between Threlkeld and Keswick

Overnight resurfacing works will be carried out on a major route through the Lake District from Monday.

A section of the A66 from Threlkeld to the outskirts of Keswick will be renewed by National Highways over a five-week period.

The work will take place between 20:00 and 06:00, with a convoy system in operation to keep traffic flowing.

Motorists have been warned some side roads along the 3.5-mile (5.6km) route will need to be closed.

National Highways Project Manager William Paterson said: "To keep disruption to a minimum, we'll have a convoy system in place where vehicles are held at traffic lights before being escorted through the roadworks by a shuttle vehicle at a speed limit of 10mph. 

"This will allow us to work on sections of the road at a time, so the road can stay open and traffic can keep moving."

Local diversions will be signposted when side roads are closed to prevent "rat running" through Threlkeld village.

Related internet links

The BBC is not responsible for the content of external sites.