Wymondham A11 contraflow as concrete road resurfaced

  • Published
Traffic on A11 northbound, with traffic cones barricading the right-hand lane
Image caption,

The concrete surface, which was laid in the 1990s, is in "desperate" need of an upgrade, Highways England said

Traffic on a section of the A11 in Norfolk is being reduced to a single lane in each direction for a year as road resurfacing work continues, external.

The northbound carriageway will temporarily close between Attleborough and the Thickthorn roundabout, near Norwich, on Saturday night.

From Sunday, a contraflow be in place with a 40mph limit, until spring 2023.

Simon Amor, of Highways England, said the surface was "well past its best" and in "desperate" need of an upgrade.

The A11 is being reconstructed in both directions between the Thickthorn roundabout and Spooner Row until June 2023.

Find BBC News: East of England on Facebook, external, Instagram, external and Twitter, external. If you have a story suggestion email eastofenglandnews@bbc.co.uk

Related internet links

The BBC is not responsible for the content of external sites.