Jammed Whitby swing bridge re-opened to traffic
- Published

Whitby's swing bridge, which was built in 1909, was upgraded last year
A North Yorkshire swing bridge which was closed after becoming stuck in an open position has been repaired.
The Whitby swing bridge, which connects two sides of the port, was shut for several hours on Tuesday before re-opening at about 20:00 GMT.
North Yorkshire County Council said a fault in the hydraulic system led to it being locked in an open position.
The authority said specialist engineers were sent to carry out emergency repairs.
The closure meant people had to make a three-mile (4.8km) detour to get from one side of the river to the other.
- Published7 January 2014
- Published20 March 2013
- Published30 July 2010
Related internet links
The BBC is not responsible for the content of external sites.