Work to replace park bridge begins

Kings Meadow FootbridgeImage source, Reading Borough Council
Image caption,

A modern larger structure will replace the bridge at Kings Meadow in Reading

  • Published

A 13-week project to replace a "deteriorating" footbridge at a popular park has begun.

A modern new structure, more than double the existing width at 4.5m (14.8ft), will replace the bridge at Kings Meadow in Reading.

Reading Borough Council said the scheme marked the start of a £4m two-year investment in bridges and other structures around the town.

The bridge will be closed during the works, with signed diversions in place.

The authority described the existing wooden structure as "well used by pedestrians and cyclists alike" but "deteriorating".

It said the replacement would be "much more robust", and made of glass fibre-reinforced polymer, with a concrete retaining wall built on the southwest corner of the bridge.

Highways and traffic services manager Sam Shean said: "This is a really important upgrade for Reading, as the Kings Meadow footbridge is a key link in our pedestrian and cycle network to encourage healthier ways to travel around Reading.

"The new bridge will be much more resident-friendly as it is more than double the width of the old one, and is being built from the most durable, modern materials."

He added: "We know that these works will cause some temporary short-term inconvenience, and thank residents in advance for their cooperation and understanding.."

Other planned projects include refurbishing Orbit Footbridge behind Queens Road car park, High Bridge in Duke Street (a scheduled ancient monument) and strengthening sections of Kennetside retaining wall.

Follow BBC South on Facebook, externalX, external, or Instagram, external. Send your story ideas to south.newsonline@bbc.co.uk, external.