Redcar's blast furnace demolished on Teesworks site
Redcar's blast furnace has been demolished in a controlled explosion, changing the Teesside skyline forever.
A 800ft (250m) exclusion zone was put in place for observers to watch the levelling of the structure, the casting houses, the dust catcher and conveyors, which were felled in a matter of seconds.
An industrial landmark since the 1970s, the furnace stood 365ft (111m) high and once produced 3.6 million tonnes of iron a year.
The former steelworks site is being cleared to create the Teesworks industrial zone, the UK's largest freeport.
Follow BBC North East & Cumbria on Twitter, external, Facebook, external and Instagram, external. Send your story ideas to northeastandcumbria@bbc.co.uk, external.