Network Rail blames 'rodent damage' for signal problems

  • Published
A ratImage source, Thinkstock
Image caption,

"Rodent damage" was blamed by Network Rail for the signalling problems

Rats chewing through power cables were responsible for "very severe" rail delays between South Wales and London.

Network Rail said "rodent damage" near Didcot, Oxfordshire, caused signalling problems earlier that affected two of the four lines into Paddington.

Caerphilly MP Wayne David was on board a train and tweeted: "You couldn't make it up."

Network Rail has apologised for the disruption and said normal services have now resumed.

In a statement it said: "The cable damage lead to a loss of signalling at Didcot, affecting two of the four lines into London Paddington.

"Engineers were able to restore power and fix the damaged cable."

This X post cannot be displayed in your browser. Please enable Javascript or try a different browser.View original content on X
The BBC is not responsible for the content of external sites.
Skip X post by Wayne David

Allow X content?

This article contains content provided by X. We ask for your permission before anything is loaded, as they may be using cookies and other technologies. You may want to read X’s cookie policy, external and privacy policy, external before accepting. To view this content choose ‘accept and continue’.

The BBC is not responsible for the content of external sites.
End of X post by Wayne David

Related internet links

The BBC is not responsible for the content of external sites.